Typical scenario to manage defect progression and status

1.Technician executes tests  and identifies a potential defect

2. Technician fills out the defect report, he/she assigns it to an Engineer for analysis and to fix it if needed

  • Status = Assigned
  • Severity should be set by technician

3. Engineer determines if defect is reproducible and  valid to be fixed,  and proposes version to fix

  • Status = Ack
  • Priority should be set by Engineer
  • Target Date and Version can be updated if known
  • Update the completion e.g. to 20%

4. When planned or available, Engineer does the fix to code, verify from his/her standpoint and requests for validation

  • Status = Resolved
  • Correction Type = Corrected (if he was able to reproduce and fix)
  • Completion = 70% maximum 

5. Technician executes same tests and reports back to Engineer  that the defect is fixed

  • Status = Closed
  • Completion = 100% maximum

 

Alternative 

5' . Technician 

executes same tests and reports back to Engineer that the defect 

is

NOT fixed


  • Status = assigned --> back to stage 2 
  • Completion = 70% maximum

 

Note : the setting of completion is somewhat arbitrary and may relay on various aspects depending on companies policies. It really depnds how you want to use the completion in you project. 

 